020 3355 8411Monday to Saturday, 9am to 5pm113 Romford Road, London E15 4LY

RICS Level 3 Building Surveys · All London boroughs

Level 3 Survey London: RICS Level 3 Building Surveys

An RICS-qualified surveyor inspects your home and writes the Level 3 report, the full structural survey for older and altered London homes, from £795 including VAT.

Level 3 surveys from £795 inc VAT. Fixed fee, confirmed in writing before you book. Prices include VAT.

  • Carried out and signed by an RICS-qualified surveyor
  • Fixed written fee before you book
  • Period houses, flats, conversions and listed buildings

Level 3 Survey London carries out RICS Level 3 Building Surveys on London homes. Every survey is inspected, written and signed by an RICS-qualified surveyor working to the RICS Home Survey Standard, and you receive a fixed written fee and our terms of engagement before you book. The report follows the RICS Home Survey Standard, Level 3.

Try the survey fee estimator to work out the fee for your home.

To talk it through, call 020 3355 8411, Monday to Saturday, 9am to 5pm. Office: 113 Romford Road, London E15 4LY.

  • Report to the RICS Home Survey Standard, Level 3
  • Fixed fee in writing before you book
  • Prices include VAT and London travel
  • Registered in England and Wales, company no. 08760284
  • Call with your surveyor after the report

Updated

Get a fixed Level 3 survey quote

Tell us about the property. We reply with a fixed written fee for the survey before anything is booked.

We only use your details to prepare your quote. Privacy.

Row of Victorian terraced houses in yellow London stock brick, with bay windows and chimney stacks, on a wet autumn street
Building surveyor in a branded fleece outside a London terrace
Illustrative image

A Level 3 survey on a London home is the most detailed inspection RICS sets out for a buyer. Your surveyor inspects the building inside and out, rates every part of it, and writes down what is wrong, why it has happened, how to repair it and what happens if you leave it. You get that report before you exchange contracts, while you can still renegotiate or walk away.

We carry out RICS Level 3 Building Surveys across London. Every survey is inspected, written and signed by an RICS-qualified surveyor working to the RICS Home Survey Standard. Your contract is with us, under the terms of engagement you receive with your fixed written fee. We read the listing, plan the survey around the building’s age and construction, and confirm the fee in writing before anything is booked.

What Is a Level 3 Survey?

RICS, the Royal Institution of Chartered Surveyors, sets out three levels of home survey. Level 3 is the deepest. Older paperwork and many buyers still call it a building survey or a full structural survey, and RICS used the name Building Survey for this product before 2021. Whatever the name, a building survey is a report on condition, written for you as the buyer and not for your lender.

The RICS consumer guide recommends a Level 3 survey for a large, older or run-down property, a building that is unusual or altered, or a purchase where you plan major works. Most of what sells in London fits at least one of those: a Victorian terrace with a rear addition, an Edwardian semi with a loft conversion, a flat carved out of a family house, anything above a shop.

Estate agents, lenders and conveyancers use the names loosely. A request for a full structural survey, a building survey or an RICS Level 3 survey on a terrace in Walthamstow or a mansion flat in Maida Vale all lead to the same product: the Level 3 inspection and report described below. If a quote from anyone uses only the words “full structural survey”, ask which RICS level and which standard it follows, so you compare like with like.

What a Level 3 Survey Covers

On the day of the survey, your surveyor walks the whole property. They look at the roof slopes, chimney stacks and parapets from the ground, from upper windows and with binoculars. They go into the roof space where the hatch is safe to use, and check the rafters, purlins, the underside of the slates and any timber cut to make room for a loft room. They lift accessible inspection chamber covers and watch the drains run. They take moisture readings low on walls and around chimney breasts, check floors for spring and slope, open windows, and look at the boiler, consumer unit and visible pipework. Your surveyor does not lift fitted carpets, move heavy furniture or cut into walls. Anything the surveyor cannot see is marked as not inspected, with the reason.

Gloved hand pressing a pin moisture meter against stained plaster just above a skirting board
Illustration: a moisture meter reading taken low on an internal wall, one of the checks made on the day.

What separates a Level 3 survey from a Level 2 survey is the depth of the advice. A Level 2 survey report tells you a defect is there. A Level 3 survey report explains the cause, the repair options, how urgent it is and what follows if you do nothing. A crack where a bay meets the front wall in Tufnell Park, or a damp patch in a lower-ground flat in Kennington, stops being a worry and becomes a costed decision.

The survey report also lists matters for your conveyancer: alterations that need planning permission or Building Regulations sign-off, replacement windows without a FENSA certificate, rewiring without Part P paperwork, boundaries that do not match the title plan, and party walls that bring in the Party Wall etc. Act 1996.

Digital level and laser measure checking a sloping Victorian floor
Illustrative image

Every part of the building the surveyor reports on gets one of four marks. They are the same at Level 2 and Level 3; what Level 3 adds is the explanation behind each one.

Diagram of the four condition ratings in a home survey report: 1 green, 2 amber, 3 red and NI for not inspected
Diagram: the condition ratings used in every Level 3 report.

Condition rating 1

Green. No repair is needed now, and the element should be maintained in the normal way. It does not mean new or perfect. Sound slate on a re-covered roof whose gutters only need clearing each autumn is a typical 1.

Condition rating 2

Amber. Repairs or replacement are needed, but the defect is not serious or urgent. Typical 2s in London are worn pointing, a few slipped slates, sash windows that need easing and draught-proofing, or an old boiler that still works. Plan and budget for them, and get quotes for the expensive ones.

Condition rating 3

Red. A defect that is serious, needs urgent repair or replacement, or needs further investigation. Active movement in a bay, a failed valley gutter letting water in, live wet rot in ground floor joists, or a removed chimney breast with no steel under the stack are all 3s. A 3 is not on its own a reason to walk away. It is a reason to get specialist quotes before you exchange.

NI (not inspected)

The surveyor could not inspect that part: a locked room, a loft hatch painted shut, a fitted floor covering. The report says why. Treat an NI on something important, such as a roof void or a cellar, as a question for the seller or a reason for a second visit.

See a Sample Report

We have not published an anonymised report of our own yet. Until we do, the honest sample to read is the RICS sample Level 3 report, published by RICS itself: it is RICS's sample, not one of ours, but every Level 3 report we write follows the same structure and order, set out below.

Every RICS Level 3 report follows the same order, so you always know where to look. In our own words, this is what you receive, section by section, and our guide to what a Level 3 survey includes walks through each one with London examples.

  • A. About the inspection. Which surveyor inspected, when, the weather, whether the home was furnished or occupied, and any related-party disclosure.
  • B. Overall opinion. The surveyor’s view of the property in plain words, a summary of every condition rating, a summary of repairs with cost guidance where practicable, and the further investigations to finish before you exchange.
  • C. About the property. Type, approximate age and dates of extensions or conversion, construction, accommodation floor by floor, means of escape, the energy rating from the EPC and any issues with it, the main services, and the location and local environment.
  • D. Outside the property. Chimney stacks, roof coverings, rainwater pipes and gutters, main walls, windows, outside doors, conservatories and porches, other joinery and finishes. On a terrace that means the parapet and valley gutter, the pointing and the brick face.
  • E. Inside the property. Roof structure, ceilings, walls and partitions, floors, fireplaces, chimney breasts and flues, built-in fittings, woodwork such as the staircase, and bathroom fittings. This is where removed chimney breasts, sagging lath and plaster and springy suspended floors are reported.
  • F. Services. Electricity, gas or oil, water, heating, water heating, drainage and common services in a block. These are inspected visually and in normal use, not tested.
  • G. Grounds. Garage, permanent outbuildings and other structures, including shared areas for flats.
  • H. Issues for your legal advisers. Regulation (planning, Building Regulations, FENSA and Part P, as far as the survey can see), guarantees, and other matters such as party walls and rights of way.
  • I. Risks. Risks to the building, the grounds and people, gathered in one place. Knotweed, possible asbestos and unguarded drops appear here.
  • J. Energy matters. Insulation, heating, lighting and ventilation, and how they relate to the condition we found.
  • K. Surveyor’s declaration. The surveyor’s name, RICS number and qualifications, confirming they inspected the property and wrote the report.
  • L. What to do now. How to act on the survey, how to get quotes and who should carry out each further investigation.
  • M. Description of the service. What a Level 3 survey covers and does not cover, and the terms of engagement.
  • N. Typical house diagram. A labelled drawing of where each element sits.

In a Level 3 survey, each element in sections D to G carries photographs, a description, our advice and a condition rating. The RICS format can also flag documents your conveyancer should obtain before you sign, such as a completion certificate for a knock-through.

When you read the RICS sample, start with section B. A good Level 3 report lets you understand the whole house from that one page, and then sends you to the sections that carry a condition rating 3. If a sample from any surveyor shows only ratings and no causes or repair advice, it is a Level 2 report under another name.

Two people at a kitchen table reading a printed survey report with colour-coded condition ratings
Illustration: reading a survey report, where each part of the building carries a condition rating.

Is a Level 3 Survey Right for Your Home?

Some homes are fine with a Level 2 survey. Most period and altered homes need the deeper Level 3, the survey many buyers still call a full structural survey. These are the signs our surveyors look for when we advise on which level of survey to book.

Signs a home needs a Level 3 survey

  • It was built before 1919. Solid 9-inch brick walls, lime mortar, timber lintels, shallow corbelled footings and slate roofs behave nothing like modern cavity construction. The figures are below.
  • It has been extended or altered. Loft conversions, rear extensions, knock-through rooms, removed chimney breasts and basement digs all raise questions about steel, support and sign-off. See our surveys for extended and altered homes.
  • You can see cracks. Diagonal cracks above openings, a gap where the bay meets the main wall, or doors that have started to bind can all mean movement. Our subsidence and structural survey page sets out how we read them.
  • There are signs of damp or decay. Tide marks, salts on plaster, a musty smell, soft skirting boards or fresh paint in one corner of a basement need a closer look. Our damp and timber surveys page covers rising and penetrating damp, condensation, wet rot and dry rot.
  • It is a conversion flat. The roof, walls, foundations and drains are shared, and their repair bills reach you through the service charge. See surveys for flats, conversions and mansion blocks.
  • It is listed or in a conservation area. Repairs must suit the building, and some work needs consent. Read about our listed building surveys.
  • You plan to renovate. For a doer-upper the report becomes your first brief to builders. See surveys for renovation projects.
  • It sits above or next to a shop. Mixed-use buildings bring separate access, fire separation and commercial leases into play. See mixed-use and flat-above-shop surveys.

If two or more of these apply, book the RICS Level 3 survey.

Stepped crack running through yellow stock brickwork above the bay window of a Victorian house
Illustration: a stepped crack above a bay window, a common sign of movement in London's period houses.

When a Level 2 is enough

A purpose-built flat from the 1990s or later, in a well-run block, with no alterations and no sign of damp, is the kind of home RICS has in mind for Level 2. So is a house fully refurbished in recent years with building control completion certificates for every structural change. Send us the listing for either and we will say so: a Level 3 survey on a home that does not need one is money you could spend on the move.

Level 2 or Level 3: Which Survey Do You Need?

RICS sets the rules for home surveys in its Home survey standard. The 1st edition came into effect on 1 March 2021 and is still the edition in force. RICS consulted on a 2nd edition between 19 August and 14 October 2025. Its September 2026 update says the intention is to publish in the first quarter of 2027, and that surveyors should keep working to the current edition until updates are officially announced. You can read the standard on the RICS Home survey standard page.

The standard defines three levels. The table sums up what RICS says about each in its consumer guide.

Level 1 Level 2 Level 3
Best for Conventional, newer homes in good condition Conventional homes in reasonable condition, simple in form Large, older, run-down, unusual or altered homes, or planned major works
Condition ratings Yes Yes Yes
Advice on repairs and maintenance Generally no Yes, on defects and needed repairs Yes, in depth: causes, repair options, what happens if left
Roof space and drains Limited More extensive than Level 1 Fullest inspection of the three
Market valuation No Available as survey and valuation Not included as standard; often an optional extra
Diagram comparing a Level 2 and a Level 3 survey on causes, repair advice, urgency, roof space and drains
Diagram: what a Level 3 report adds to a Level 2.

Is a Level 3 survey overkill for a Victorian terrace?

Buyers ask this when a Level 3 quote comes in a few hundred pounds above a Level 2. For a Victorian terrace, it is not overkill. RICS recommends a Level 2 survey for conventional homes in reasonable condition that are simple in form and layout, and gives a property without multiple alterations or extensions as its example. It recommends Level 3 for a large, older or run-down property, or one that is unusual or altered.

Very few London terraces fit the Level 2 description, and buyers who ask us for a full structural survey on a terrace are asking for this RICS Level 3 survey. A house built in the 1880s has had well over a century of owners. Most have a rear addition, many have a loft conversion or a knocked-through ground floor, and plenty have lost a chimney breast along the way. On the VOA figures below, 20.8% of London homes were built before 1900, and terraced houses made up 29% of sales in the Land Registry table.

A Level 2 can be a fair choice for a terrace fully refurbished in recent years, with building control completion certificates for the structural work and no sign of movement or damp. If you are unsure, send us the listing and a surveyor will tell you which level of survey suits the house. Our Level 2 vs Level 3 guide sets out the test in full.

How Much Does a Level 3 Survey Cost in London?

Our fee is set by size, not by value or postcode, and every price includes VAT. You pay for the time your home takes, not its postcode. A studio to two-bedroom flat or house is £795, three bedrooms £895, four bedrooms £995 and five bedrooms from £1,195. Homes worth £1m to £2m add £300, and homes of six or more bedrooms or worth £2m or more get a written quote. Age, a flat with no loft access and the borough never change the fee. Fixed fee, confirmed in writing before you book.

PropertyHow the fee is made upFee including VAT
£400k 2-bed flat in StratfordStudio to 2 bedrooms (flat or house) £795. Value, age and borough add nothing.£795
£650k 1-bed flat in IslingtonStudio to 2 bedrooms (flat or house) £795. Value, age and borough add nothing.£795
£475k extended 4-bed terrace in Dagenham4 bedrooms £995 + Extended (rear, side or loft) £100£1,095
£800k 3-bed Victorian terrace in Walthamstow3 bedrooms (flat or house) £895. Value, age and borough add nothing.£895
£1.5m 4-bed house with a basement in Highbury4 bedrooms £995 + Value loading, £1m to £2m £300 + Basement or cellar £150£1,445

The full table, with the add-ons and what the fee covers, is in our building survey cost guide, and the survey fee estimator works out the fee for your property.

Other firms price in other ways. The RICS consumer guide says Level 3 surveys sit at the higher end of survey prices, with some bespoke services costing over £1,000, and it advises asking for a written quote that sets out exactly what is included. We do not quote other firms’ fees here: a fee is only comparable once you know the level, the standard and the extras it covers.

What changes the fee across the market

Other surveyors weigh these factors. Ours are simpler: bedrooms, a loading at £1m and above, and add-ons for a listed building, an extension, a basement, an express report, a drone roof survey or a valuation.

  • Size and number of rooms. More rooms, storeys and outbuildings mean more time on site and a longer report.
  • Age and construction. A Georgian townhouse with basement vaults, a mansard roof and lime render takes longer to assess than a 1990s flat.
  • Value. Many surveyors and lenders price by value bands, partly because their insurance cost rises with value.
  • Listed status. A listed building survey needs a surveyor who knows traditional materials and usually takes longer.
  • Access and parking. Central London parking and the Congestion Charge add to some firms’ costs. Upper-floor flats with roof access through a hatch take more time.
  • Naming. A quote for a “full structural survey” should say which RICS level it is, so you compare like with like.
  • Optional extras. A market valuation, an insurance reinstatement figure, drone roof photographs or repair cost guidance are often charged on top.

Is a Level 3 Survey Worth It?

Measure the fee against the price of the home and the cost of what the survey can find. In the Land Registry figures below, the median price paid for a terraced house in Greater London was £585,000. Our fee for a three-bedroom house is £895, fixed in writing. A failed valley gutter, a bay that needs underpinning or wet rot in the ground floor joists can each cost many times that, and a Level 3 survey is the point at which you can still use the finding to renegotiate.

What the extra buys on a terrace, over a Level 2:

  • The roof you cannot see from the street. The valley gutter and the back of the parapet get the fullest inspection of the three levels, from the roof space and from rear windows.
  • The bay and the rear addition. Both often stand on shallower footings than the main house. The survey tells you whether a crack is old and settled or needs an engineer.
  • Alterations. Steel beams, removed chimney breasts and loft conversions are described, with the paperwork your conveyancer should ask for.
  • Damp in solid walls. The survey explains the cause, not only the meter reading, which matters when a contractor later offers to inject a damp-proof course.
  • Repair options and urgency. That is the evidence you need to renegotiate.

It is worth least on a home that is young, unaltered and in good order, where a Level 2 tells you nearly as much. It is worth most where the report changes a decision: a conversion flat with a short lease and a tired roof, a 1930s semi with cracks at the bay, a Georgian house with a basement that has been dug out. For a Level 3 survey in London the question is rarely whether the house has defects. It is whether you know which ones matter before you exchange.

Why London Homes Need a Closer Look

London’s housing is old, often altered and mostly built on clay. Each of those facts changes what a London surveyor inspects and how hard they look.

Solid walls, soft brick and lime mortar

Much of inner London went up between the 1850s and the First World War. These houses have solid walls, usually 9 or 13 inches of brick with no cavity, laid in soft lime mortar. The wall works by letting moisture in and out. Repoint it in hard cement, or coat the front in cement render, and the water stays in the brick. Soft London stock brick then spalls: frost lifts the face off the brick. Inside you see damp patches that a contractor will call rising damp.

Surveyors see the same mistake with insulation. Foil-backed board or a non-breathable internal lining fixed to a solid wall can cause interstitial condensation, where water condenses inside the wall build-up and rots battens and joist ends out of sight. Your surveyor checks the wall finish, the readings and the joinery around it, and we say plainly when the cure is to remove the cement, not to inject a chemical damp-proof course.

Diagram of four ways damp enters a solid brick wall: a leaking gutter, a raised bed bridging the damp-proof course, ground moisture and condensation
Diagram: the damp routes a surveyor separates before blaming rising damp.
Deep-wall moisture probes testing plaster above a skirting board
Illustrative image

Butterfly roofs, valleys and parapet gutters

Many terraces have a butterfly roof, also called a London roof: two slopes falling inwards to a central valley gutter, hidden behind a front parapet. When the valley is blocked with leaves or the lead has split, water runs straight into the top-floor ceilings, often for months before anyone notices. Your surveyor inspects the valley from rear windows and the roof space, checks the parapet gutter outlet, the flashings and the slate fixings, and tells you whether the covering is near the end of its life. Iron nails rusting through on original Welsh slate, known as nail fatigue, is common on roofs that have not been re-covered. Our period house survey page goes through these houses element by element.

Cross-section diagram of a London butterfly roof with its chimney stack, front parapet, inward slate slopes and central valley gutter
Diagram: the parts of a butterfly roof, most of them out of sight from the street.

Bays, shallow footings and London Clay

Most of London north of the Thames, and large parts to the south, sits on London Clay. The British Geological Survey describes it as very susceptible to volume change: it swells when wet and shrinks when dry. That causes subsidence in dry summers and heave when the ground wets up again. BGS calls shrink-swell the most damaging geohazard in Britain today. Its modelling shows the clay’s plasticity rising from west to east across the city, and its 2021 research named highly populated northern and central boroughs among the most susceptible areas in Britain. You can read more on the BGS shrinking and swelling soils page.

Victorian builders often set bay windows and rear additions on shallower corbelled footings than the main walls, so they move on their own. A plane, oak or poplar close to the house draws water out of the clay and makes it worse. BGS advises against planting or removing trees near buildings on high-plasticity clay without expert advice, because felling a mature tree can let the clay swell. Trees in conservation areas and under preservation orders are also protected: see the government’s guidance on tree preservation orders and trees in conservation areas.

On a Level 3 survey we measure crack widths, record their pattern and taper, note nearby trees and their likely height, look for past underpinning, and tell you whether a structural engineer or a period of crack monitoring is needed before you commit.

Diagram of three crack patterns in brickwork: stepped from a window corner, tapered and wider at the top, and horizontal cracks every few courses
Diagram: three crack patterns and what each can point to.
Crack width gauge held against a stepped crack in London stock brick
Illustrative image

Interwar cavity walls and wall ties

The 1930s semis of the outer boroughs have early cavity walls. The steel ties that bind the two leaves were often thinly galvanised and have corroded. Rusting ties expand and lift the outer brickwork, which shows as horizontal cracks every few courses. Your surveyor looks for that pattern, and for pebbledash render that has started to hollow and hide it.

Borescope camera checking inside a London brick cavity wall
Illustrative image

Conversions, leases and shared structure

A large share of London’s homes are flats, and many sit in houses built for one family. Floors between flats may have poor sound and fire separation. Chimney breasts may have been removed with no steel or gallows brackets left to carry the stack above. Soil pipes may have been rerouted through voids we cannot see into. The conversion itself needed planning permission, Building Regulations approval and, under most leases, the freeholder’s consent.

In a leasehold flat the freeholder or management company usually repairs the roof, walls and structure, and you pay your share through the service charge. A failing roof on a building of four flats is a bill that will arrive through a section 20 consultation, the process a landlord in England and Wales must follow before major works. Our survey findings give your solicitor specific questions for the management pack.

Damp-proof courses, floors and hidden materials

Many pre-1919 houses have no damp-proof course, or a slate one that has cracked. Most damp we find on London surveys comes from bridging instead: a raised garden bed, a patio laid above floor level, render run down to the ground. Suspended timber ground floors need through-ventilation, and blocked air bricks lead to wet rot in joist ends and, in the worst cases, dry rot. Lath and plaster ceilings sag and lose their key. Textured Artex coatings and some 1960s and 1970s boards may contain asbestos, which a Level 3 survey flags but does not test; the HSE asbestos pages explain the duty to manage it. Japanese knotweed in a garden or along a railway boundary is something lenders ask about, and the government sets out how to prevent it spreading.

Thermal imaging camera showing cold spots around a Victorian bay window
Illustrative image

London housing stock in numbers

The Valuation Office Agency records the build period of every home on the Council Tax list. The table below uses its latest figures, as at 31 March 2026, from table CTSOP4.1 of the Council Tax: stock of properties 2026 release, published by the Valuation Office Agency. We have worked out each share from the VOA counts, using all properties on the list as the base (a small number with an unknown build date are included in that base). The London row covers all 33 local authorities of Greater London.

Area Homes on Council Tax list Built before 1900 Built 1900 to 1918 Built before 1919 (total) Built 1919 to 1939
England 25,936,540 14.9% 5.0% 19.9% 14.7%
London 3,863,700 20.8% 8.2% 28.9% 22.0%
Kensington and Chelsea 89,660 62.2% 2.4% 64.6% 8.3%
Hammersmith and Fulham 96,270 47.5% 7.4% 54.9% 9.1%
Haringey 115,610 36.3% 17.4% 53.7% 10.8%
Westminster 131,940 44.1% 4.4% 48.4% 10.0%
Camden 114,360 44.5% 3.5% 48.1% 8.9%
Waltham Forest 111,800 24.1% 20.6% 44.6% 18.9%
Islington 112,310 35.8% 7.3% 43.1% 4.0%
Wandsworth 159,360 31.9% 11.1% 43.0% 7.1%
Lambeth 149,490 36.4% 3.2% 39.6% 13.5%
Richmond upon Thames 85,870 20.3% 17.5% 37.7% 24.1%
Hackney 121,100 29.3% 5.5% 34.8% 7.7%
Lewisham 134,760 27.6% 6.6% 34.2% 17.5%
Southwark 151,430 22.0% 2.4% 24.5% 6.9%
Barnet 162,740 6.4% 13.3% 19.7% 33.3%
Bromley 143,690 12.1% 4.9% 17.0% 29.7%
Tower Hamlets 151,530 10.6% 1.0% 11.7% 4.0%

The VOA groups interwar homes into two bands, 1919 to 1929 and 1930 to 1939, which we have added together. Its next band starts at 1945.

What the figures mean on site

Across London, 28.9% of homes were built before 1919, against 19.9% in England as a whole. Add the interwar years and just over half, 51.0%, were built before 1940. In Kensington and Chelsea nearly two in three homes predate the First World War. In Hammersmith and Fulham and Haringey more than half do.

Older homes fail in predictable ways, which is why the figures matter to a survey. Pre-1919 London houses are where surveyors find solid walls with no damp-proof course or a broken slate one, timber lintels over windows, original roof slopes with nail fatigue, and lead or iron supply pipes. Interwar homes, about a third of the stock in Barnet and nearly a third in Bromley, bring corroding cavity wall ties, bays with flat roofs, and pebbledash render hiding cracks.

Boroughs with newer stock, such as Tower Hamlets and Southwark, still have streets of much older homes. A Georgian terrace in Bow or a Victorian house in Camberwell needs the same care as one in Chelsea. The borough average describes the market. The survey describes the house.

The 2021 Census adds the conversions. Across Greater London, 11.1% of households lived in part of a converted or shared house, against 3.5% in England as a whole, and the figure passes a fifth in Camden, Hammersmith and Fulham, Kensington and Chelsea, Haringey, Islington and Lambeth. Every one of those flats shares a roof, walls and drains with its neighbours, which is why the borough pages carry the figure for each borough.

Sold prices and energy certificates

Two other public records fill in the picture. HM Land Registry publishes each sale it registers in England and Wales in its Price Paid Data. The table counts standard price paid entries for sales in the 33 Greater London authorities dated 1 October 2025 to 30 September 2026, as published by 3 November 2026. Sales take time to register, so the most recent months will rise.

Type of home Sales registered Share of sales Median price paid
Flats and maisonettes 30,070 50% £425,000
Terraced houses 17,545 29% £585,000
Semi-detached and detached houses 12,814 21% £670,000
All homes 60,429 100% £518,000

The Energy Performance of Buildings Register adds a second view of age. It holds an energy certificate (EPC) for every home in England and Wales sold, let or built since 2008, and the government publishes the records through its Get energy performance of buildings data service. You can look up the certificate for any address with the find an energy certificate service. Taking the latest certificate for each London home, from certificates lodged up to 12 October 2026, gives 3,043,700 homes. The energy assessor recorded 9% of them as built before 1900, 20% as built from 1900 to 1929 and 18% as built from 1930 to 1949. Homes built from 2003 onwards make up 22%, and 66% of all homes with a certificate are flats or maisonettes.

The two official age records broadly agree. The VOA puts 28.9% of homes before 1919, and the EPC register puts 29% before 1930. Close to three in ten London homes are of an age where RICS points buyers to a Level 3 survey. Two more public records describe a single address: the Valuation Office Agency publishes council tax bands, and HM Land Registry explains how to get information about property and land. Both are worth reading beside a Level 3 survey report. Each of our borough pages carries the same figures for that borough. The Land Registry figures in this section are HM Land Registry data, © Crown copyright and database right 2026, used under the Open Government Licence v3.0.

Drone and High-Level Inspection

London roofs hide their worst defects. The valley gutter of a butterfly roof sits behind the front parapet, out of sight from the pavement. On a tall stucco terrace the roof sits behind a parapet and cornice, and the chimney stacks of a four-storey house in Islington are a long way above the street. A Level 3 inspection looks at roofs from the ground, from upper windows, with binoculars from the street and the garden, and from inside the roof space where the hatch is safe to use. Where a pole camera can reach a low parapet gutter, the surveyor uses one. Any slope that still cannot be seen is marked not inspected, with the reason.

For roofs that stay out of sight you can add a drone roof survey to your Level 3 survey for £300. Over a London terrace the drone photographs the valley gutter, the parapet gutters and outlets, the flashings, the slates and the chimney stacks from above, and the photographs go into the report with the surveyor’s comments on each. A roof that would otherwise be marked NI can then carry a condition rating. Drone flights follow the Civil Aviation Authority’s rules for drones and need dry, calm weather.

Binoculars used to inspect a chimney stack and slate roof from the street
Illustrative image
Aerial view over rows of Victorian terrace roofs with chimney stacks, valley gutters and back gardens
Illustration: terrace roofs seen from above, the view a drone adds to a roof inspection.

How It Works: From Quote to Report

From the first form to the follow-up call, this is the whole process. Every step follows the RICS Home Survey Standard, which applies to RICS members across the United Kingdom.

Building surveyor at the foot of a loft ladder in a period hallway
Illustrative image

Step 1: Tell us about the property

Send the address, the agreed price, the property type, roughly how old it is, and anything that worried you on the viewing: cracks, damp, a loft conversion, a large tree. Send the agent’s listing too. Your surveyor uses it to plan the survey.

Step 2: Your fixed written fee

We check the type, age and construction of the building and plan the Level 3 survey. You receive a fixed written fee setting out the price including VAT, what is covered, any add-ons such as a valuation, and the expected report date. Nothing is booked until you accept it.

Step 3: Our terms of engagement

Your contract is with us. Before the survey we send our terms of engagement: the scope of the survey, any limits on what can be inspected, the fee and how to complain. Read them, ask us anything, and sign.

Step 4: The inspection

We agree access with the estate agent or seller. You do not need to be there. On an RICS Level 3 survey your surveyor works through the roof, walls, loft, floors, services, drains and grounds with a moisture meter, binoculars, a torch, a ladder for safe roof-space access and, where needed, a pole camera or a drone for roofs that cannot be seen from the ground.

Step 5: The report and the follow-up call

The written survey report arrives on the date in your fixed fee letter. Read the overall opinion and every condition rating 3, list your questions and call your surveyor, who inspected the home and wrote the report. The follow-up call is included in the fee.

Building surveyor's inspection kit laid out on floorboards
Illustrative image

Why buyers choose our surveys

We do one thing: survey a particular home and tell you the truth about it, at a fixed price.

A fixed written fee first. You see the price, the VAT, the scope and the report date in writing before anything is booked. If it does not suit you, you do not proceed.

An RICS-qualified surveyor on every job. Every survey is inspected, written and signed by an RICS-qualified surveyor working to the RICS Home survey standard. We are independent of the estate agent, the seller and any lender.

A written contract with us. Your contract is with us, under our terms of engagement. Your surveyor remains personally bound by the RICS Rules of Conduct. Complaints come to us under our complaints procedure, and if one is not resolved, our terms name the independent redress scheme.

No repair firm behind the report. We do not sell damp-proofing, underpinning, roofing or any other repair work, and we do not pass your details to contractors. If the report recommends a structural engineer, a drain CCTV survey or an asbestos surveyor, you choose who to use.

The surveyor who inspects writes the report. The surveyor who walks the property writes and signs the report and takes your follow-up call. Nothing is handed on.

How to check a surveyor before you book

Search results for a building survey are a mix of firms, directories and comparison sites. Five checks sort them out. Apply every one of them to us as well.

1. Check the RICS register

RICS runs a directory called Find a Surveyor. RICS itself warns that not every firm listed there is registered with RICS, so check twice. Ask whether the company is an RICS Registered Firm (L3S London is not), and confirm the individual surveyor on the RICS list of members. RICS tells consumers to look for the designations AssocRICS, MRICS or FRICS.

2. Ask which standard the report follows

It should be an RICS Home Survey Level 3, or a building survey written to the RICS Home survey standard. A quote that says only “structural survey” or “full structural survey” needs a follow-up question about the standard behind it. The standard requires written terms of engagement before the inspection.

3. Get a fixed written fee

A proper quote names the property, the level of service, the total fee and the VAT, and lists any extras such as a valuation.

4. Confirm professional indemnity insurance

RICS says regulated professionals hold appropriate professional indemnity insurance. Ask the firm to confirm its cover in writing, and ask how complaints are handled.

5. Read a sample report

Check that it explains causes and repair options, not only condition ratings, that it has photographs, and that it is written in plain English. Ask who will inspect and whether the same person writes the report.

Two further points matter in London. Choose a surveyor who knows London’s clay, its conservation areas and its typical conversions. And make sure the firm is independent of the estate agent and of any contractor who would profit from the findings.

Pre-survey checklist

Small steps before and after a Level 3 survey make the survey report far more useful.

Before you book

  • Check whether the home is listed or in a conservation area on the council’s website.
  • Check the flood risk for the address on the government’s long term flood risk service, which covers rivers and the sea, surface water, reservoirs and, where data exists, groundwater. Surface water flooding is a real risk for London basements and lower-ground flats.
  • Look up the title and price history with HM Land Registry’s property information service.
  • Ask the agent for the age of the property, the dates of any extensions or loft conversions, and whether the paperwork exists.
  • For a flat, ask who manages the building and whether major works are planned.
  • Note what worried you on the viewing: cracks, smells, stains, fresh paint, a tree close to the house.
  • Ask us for a fixed fee for an RICS Level 3 survey and send all of the above.

On the day

  • Make sure the agent has keys for the loft hatch, garden gates, outbuildings and any cellar or vault.
  • Ask the seller to leave access to the boiler, consumer unit, stopcock and meter cupboard.
  • Ask your surveyor to call you after the survey with first impressions.
  • Do not expect the surveyor to move furniture or lift floors. Anything hidden is recorded as not inspected.

When the report arrives

  • Read the surveyor’s overall opinion first, then every condition rating 3.
  • Write down your questions and book the follow-up call.
  • Send the section for your legal advisers to your solicitor straight away.
  • Get specialist quotes for any further investigations before exchange.
  • Decide whether to renegotiate, ask for repairs, or proceed as agreed.

If you are buying an old brick house, our post on cement render and repointing on brick homes explains one of our most common findings. For timings, read how long a Level 3 survey takes.

What Happens If the Survey Finds Problems?

Almost every Level 3 survey on an older London home finds something. That is what you paid for.

First, separate the ratings. Condition rating 1 items need nothing. Condition rating 2 items are your future maintenance list. Condition rating 3 items and any further investigations are the ones to act on before exchange.

Second, get evidence. If the survey reports movement, ask a structural engineer to look. If the survey finds slow-running drains or displaced joints in a chamber, a CCTV drain survey costs far less than digging up a garden later. If the surveyor flags a possible asbestos-containing material, ask a licensed asbestos surveyor. Contractor quotes turn a worry into a number.

Third, decide. You have four realistic options:

  1. Renegotiate the price, using the survey report and the quotes to show the cost of putting things right.
  2. Ask the seller to carry out repairs before completion, with evidence of the work and any certificates.
  3. Ask for a retention, where part of the price or mortgage is held back until work is done. Your solicitor and lender must agree.
  4. Walk away, if the problems outweigh what the home is worth to you. Until you exchange contracts in England, you are not bound to buy.

Our guide on renegotiating after a survey finds problems covers how buyers approach it, and Japanese knotweed and your survey covers one finding that lenders take especially seriously.

A Survey Is Not a Mortgage Valuation

The lender’s valuation is carried out for the lender, to confirm the property is good security for the loan. The valuer may spend a short time at the property and does not report to you on condition. A Level 3 survey is commissioned by you and written for you. Your surveyor owes you a duty of care under terms of engagement you sign before the inspection, and if the survey misses something a competent surveyor should have found, you have a route to complain and, if needed, to claim. The valuation protects the bank. The survey protects you.

Level 3 survey findings can still change the mortgage. A lender that learns of movement, a missing completion certificate or knotweed near the boundary may ask for a specialist report, hold back a retention or reduce the loan. Buildings insurers in London ask about subsidence history, flood risk and the roof covering. A Level 3 survey that has already answered those questions shortens the conversation.

London Property Rules Buyers Should Know

A Level 3 survey is about the building, but several laws decide what you can do with it and what the seller should have done first. Most of them are laws of England, or of England and Wales, applied in London by its councils. In an RICS Level 3 survey we flag these in the section for your legal advisers, and your conveyancer checks them. Our property law guide for buyers covers each in more depth.

Party Wall etc. Act 1996

Most terraced and semi-detached homes in London share at least one wall. The Party Wall etc. Act 1996, which applies across England and Wales, sets out how building work affecting that wall must be handled, and the Act itself is on legislation.gov.uk. According to the government’s explanatory booklet, the building owner must give at least two months’ notice for work to an existing party wall, and at least one month’s notice for a new wall on the boundary or for excavation near a neighbour’s building. Excavation is caught if it is within 3 metres of a neighbour’s building and deeper than its foundations, or within 6 metres and reaching a line drawn down at 45 degrees from the bottom of its foundations. The neighbour has 14 days to respond.

If the seller has converted the loft, removed a chimney breast or dug a basement, your solicitor should ask for the party wall awards. In the loft on a Level 3 survey we look at whether the stack above a removed breast is carried on steel or gallows brackets, and whether a new beam bears into the party wall. If next door is about to start work, you need to know. Our post on party wall issues before buying explains what to ask.

Building Regulations, FENSA and Part P

Structural alterations, new drainage, rewiring, new windows and many other works must comply with the Building Regulations, which in London are the regulations for England. The GOV.UK building regulations page warns that without approval you will not have the certificates of compliance you may need when you sell. Replacement windows and electrical work are often signed off by an installer registered with a competent person scheme, such as FENSA for windows, instead of by the council. Every Approved Document is listed in the government’s Approved Documents collection, and the Building Control team at the council, for example in Westminster, Hackney or Kensington and Chelsea, holds the records for work it signed off, which the legal section of a Level 3 survey report asks your solicitor to check. Electrical work in homes falls under Approved Document P, and structural work under Approved Document A. When a surveyor sees a knocked-through wall, a loft room or a new bathroom on a survey, we ask your solicitor to check for a completion certificate. If it is missing, the options include asking the seller to apply for regularisation, or indemnity insurance, though insurance does not make unsafe work safe.

Conservation areas and Article 4

Large parts of London are conservation areas, where the council controls changes that affect the character of the street. Camden alone has 40 conservation areas covering about half the borough. Many councils have also made Article 4 directions, which remove some permitted development rights, so replacing front windows, altering a front wall or painting brickwork may need planning permission.

Two things follow for a buyer. If a previous owner swapped timber sashes for uPVC without permission, the council can in some cases require them to be put back. And your own plans may need consent. Your surveyor notes alterations that look recent. Read more in buying a house in a conservation area.

Listed buildings

Historic England explains that around 2.5% of listed buildings are Grade I, around 5.8% are Grade II* and around 91.7% are Grade II, the grade a homeowner is most likely to own. Listing covers the whole building, inside and out, so replacing windows or changing the plan can need listed building consent. Carrying out works to a listed building without consent is a criminal offence, according to Historic England, and the liability can pass to a new owner. You can search the National Heritage List for England by address. Historic England is the government’s adviser on the historic environment in England, and its GOV.UK page lists its guidance and publications. A survey of a listed home should be done by a surveyor who understands lime, timber and traditional repair. See listed building surveys.

Leasehold flats and building safety

Most flats are leasehold. As GOV.UK explains for England and Wales, you own a leasehold property for a fixed period under a lease with the freeholder, and ownership goes back to the landlord when the lease ends. Check the lease length, the ground rent, the service charge, the reserve fund and any planned major works.

The survey reports on the condition of the building as far as your surveyor can see it. Your solicitor uses that alongside the management pack (often the LPE1 form) to check who pays for what. For taller blocks in England, the Building Safety Act 2022 adds a separate regime: a higher-risk building is one at least 18 metres high or with at least 7 storeys, containing at least 2 residential units. Cladding, fire safety and any EWS1 form then become questions for your conveyancer and lender.

Areas We Cover Across Greater London

We carry out Level 3 surveys in all 32 London boroughs and the City of London, the 33 local authorities of Greater London. The stock changes from one to the next. Victorian terraces dominate Hammersmith and Fulham and Haringey. Interwar semis shape much of Barnet and Bromley. Stucco terraces and mansion blocks define Kensington and Chelsea, and Georgian squares run through Islington and Camden.

In east London, Barking and Dagenham has the Becontree estate’s 1920s cottages, Newham and Tower Hamlets mix Victorian terraces with post-war blocks, and Havering and Redbridge are mostly interwar suburbs. In west London, Hillingdon, Hounslow, Harrow and Brent run from Edwardian terraces to 1930s semis on the clay. In south London, Croydon, Sutton and Bexley have large stocks of interwar and post-war houses, and in north London Enfield’s terraces and semis sit on clay with many mature street trees. In the City of London most homes are flats in converted or modern blocks, where the lease and the building’s shared parts matter as much as the flat. Each area page covers local building types, ground conditions and council rules. Start with your borough below or browse every area we cover.

The outer boroughs of Greater London have more interwar houses and more mature street trees, and the inner boroughs more conversions and conservation areas, so the borough decides where a surveyor spends the extra hour. The fee for the building survey does not change with it.

All 33 London areas we cover

Find us

113 Romford Road
London E15 4LY

Monday to Saturday, 9am to 5pm. Call 020 3355 8411. We do not see clients at the office: please call, send the form or email.

Show on OpenStreetMap

Every Level 3 survey follows the same structure. What changes with the building is where we spend the time, so pick the page that fits your property:

Period house surveys

A Level 3 period house survey that reads a London Victorian, Edwardian or Georgian house the way it was built: solid walls, lime mortar, hidden roofs and shallow footings.

Listed building surveys

A Level 3 listed building survey for London homes: condition, traditional materials, and the alterations that may have been made without listed building consent.

Flats and conversions

A Level 3 flat survey that looks past your front door to the shared roof, main walls, fire separation and the major works that become service charges.

Extended and altered homes

A Level 3 extended property survey for London homes that have grown or been opened up: how the new work performs, where it meets the old house, and what paperwork should exist.

Subsidence and structure

A subsidence and structural survey for London houses with cracking or past movement: what we inspect, what the cracks are likely to mean, and whether an engineer or monitoring is needed before exchange.

Damp and timber

A damp and timber survey within a RICS Level 3 inspection that finds the real cause of damp and decay in London homes, by a surveyor with no treatment to sell.

Renovation and probate

A renovation survey that turns a run-down London property into a ranked list of repairs, risks and questions for your conveyancer before you commit to buy.

Mixed-use and flat above shop

A mixed-use survey for London homes above shops, cafes and offices: the shared building, fire separation and the questions lenders and conveyancers ask.

These guides answer the questions London buyers ask before they book a Level 3 survey: what it costs, what is included, which level to choose and which property laws affect the purchase. You can also read our full FAQ, see how our surveys work, read about us, or contact us for a fixed fee.

Our articles cover the survey questions that come up between offer and exchange, from knotweed to party walls.

All articles

Jump straight to the answer

Each Level 3 survey guide is split into sections you can open directly.

Questions buyers ask before they book

Level 3 Survey FAQs

How much does a Level 3 survey cost in London?

Our Level 3 fee is set by size and includes VAT: £795 for a studio to two-bedroom flat or house, £895 for three bedrooms, £995 for four and from £1,195 for five, with £300 added for homes worth £1m to £2m. The RICS consumer guide places Level 3 surveys at the higher end of survey prices, with some bespoke services costing more than £1,000. Our fee is fixed, confirmed in writing before you book.

What is the difference between a Level 2 and a Level 3 survey?

Both use the same condition ratings. A Level 2 suits a conventional home in reasonable condition and tells you a defect is there. A Level 3 goes further on site and in the report: we explain the likely cause of each defect, the repair options, how urgent it is and what happens if it is left. RICS recommends Level 3 for older, larger, altered or run-down homes, which covers most period houses and conversions in the capital.

What does a Level 3 survey cover?

Your surveyor inspects everything they can safely see and reach: chimney stacks, roof coverings, gutters and parapets, main walls, windows and doors, the roof space, ceilings, walls, floors, fireplaces and chimney breasts, joinery, bathrooms, outbuildings and the grounds. Electrics, gas, water, heating and drainage are inspected visually and in normal use, not tested. Each element gets a condition rating, with advice on repairs and on any further investigation needed before exchange.

Is a Level 3 survey worth it?

For a pre-1919 house, an altered home or a conversion flat, yes. The fee is small next to an unexpected valley gutter, subsidence or rot repair, and the report gives you evidence to renegotiate or ask the seller to put things right before exchange. For a recent, unaltered flat in good order, a Level 2 survey may be enough, and we will tell you so.

How long does a Level 3 survey take?

The survey takes longer than a Level 2 because your surveyor looks harder and records more. A small flat can be done in part of a day; a large period house with a cellar and a converted loft can take most of one. Writing the report takes further working days, or 2 working days if you add the express report. Your fixed written fee states the inspection date and the date the report is due.

Does a Level 3 survey check for asbestos?

Not by testing. Your surveyor notes materials that may contain asbestos, such as textured Artex ceilings, cement flue pipes and soffits, and some 1960s and 1970s boards and floor tiles, and flag them in the report. Confirming asbestos needs samples analysed by a specialist asbestos surveyor. If we raise it, get that advice before you exchange, especially if you plan building work.

Does a Level 3 survey include a valuation?

Not as standard. RICS lists the market valuation as part of the Level 2 survey and valuation product, not the Level 3. You can add a market valuation to our survey for £200. Your mortgage lender's valuation is a separate thing again: it is for the lender and is not a survey of condition.

Can I get a Level 3 survey on a London flat?

Yes. On a flat survey we inspect the inside in full, and the outside and shared parts of the building as far as we can see them from the ground, the common parts and any accessible roof space. It matters most in converted Victorian houses, where the roof, walls and drains are shared and their repair bills come through the service charge.

Can I get a Level 3 survey in London at no cost?

No. A Level 3 survey takes hours on site and further time to write, so any surveyor will charge for it. What a lender sometimes provides at no charge is a mortgage valuation, which RICS describes as a limited check for the lender's benefit and not a survey. Be wary of a no-cost survey from a contractor who sells repairs: the firm reporting on the building should not profit from the work it recommends.

Who carries out the survey when I book with you?

We do. An RICS-qualified surveyor inspects the property, writes the report and signs it, working to the RICS Home Survey Standard. We take your details and send you a fixed written fee. Before you book you also receive our terms of engagement, and your contract for the survey is with us under those terms. The same surveyor takes your follow-up call.

Sources

  1. RICS: Home survey standard (1st edition in effect from 1 March 2021; 2nd edition under review) (checked 26 November 2026)
  2. RICS: Home survey standard 2nd edition, September 2026 update (checked 26 November 2026)
  3. RICS consumer guide: House surveys, the costs, types and benefits of an RICS Home Survey (checked 26 November 2026)
  4. RICS: Sample Home Survey Level 3 report (RICS's own sample, not ours) (checked 26 November 2026)
  5. Valuation Office Agency: Council Tax stock of properties 2026 (table CTSOP4.1, build period, as at 31 March 2026) (checked 26 November 2026)
  6. British Geological Survey: Swelling and shrinking soils (checked 26 November 2026)
  7. British Geological Survey: Shrink-swell property hazard information (checked 26 November 2026)
  8. British Geological Survey: Maps show the real threat of climate-related subsidence to British homes (2021) (checked 26 November 2026)
  9. GOV.UK: Party Wall etc. Act 1996 guidance (checked 26 November 2026)
  10. GOV.UK: The Party Wall etc. Act 1996 explanatory booklet (checked 26 November 2026)
  11. Historic England: What are listed buildings? (checked 26 November 2026)
  12. Camden Council: Conservation areas (checked 26 November 2026)
  13. GOV.UK: Building regulations approval (checked 26 November 2026)
  14. GOV.UK: Leasehold property (checked 26 November 2026)
  15. GOV.UK: Criteria for being a higher-risk building during the occupation phase (checked 26 November 2026)
  16. GOV.UK: Check long term flood risk (checked 26 November 2026)
  17. HM Land Registry: Price Paid Data (sales dated 1 October 2025 to 30 September 2026, published to 3 November 2026; Open Government Licence v3.0) (checked 26 November 2026)
  18. GOV.UK Get energy performance of buildings data: domestic EPCs, England and Wales (certificates lodged 2008 to 12 October 2026; Open Government Licence v3.0) (checked 26 November 2026)
  19. ONS Census 2021 via Nomis: TS044 accommodation type (checked 26 November 2026)
  20. RICS: Find a Surveyor directory (checked 26 November 2026)
  21. RICS: Find a member (checked 26 November 2026)
  22. Civil Aviation Authority: Drones (checked 26 November 2026)

Get a Fixed Quote

Send the address and the agreed price. You get a fixed written fee and our terms of engagement before anything is booked.

Get a fixed quoteCall 020 3355 8411